Releases 1.60.0 – 1.98.0

Newest first. Three numbers, and which of them moves says what happened to you rather than how much work it was.

The first moves when something that worked stops working: a query that used to answer and now does not, a saved list that will not load, a link you shared that no longer opens what it opened. It has never moved, and that is the whole of what it is for.

The second moves when the page answers something it could not answer before, or answers it better than it did. New grammar is the usual reason. A correction is the other, and a correction is not a break even though the answer changes underneath somebody: "days be christmas" used to say 154 days and now says nothing, because it was reading Belgium out of the word "be", and taking that away left the page more right rather than less useful. An answer that gains a drawing of what it just said counts here too.

The third moves when nothing you type comes back any different.

Numbers get skipped when it takes more than one commit to introduce a release, so only the release from the last commit goes out.

1.98.031 July 2026

The nth Fibonacci number

1.97.031 July 2026

Is 28 a perfect number

1.96.031 July 2026

Is 100 a square number

1.95.031 July 2026

The square of 5, said that way round

1.94.031 July 2026

A logarithm with its base said out loud

1.93.031 July 2026

Rounding that says how much to keep

1.92.031 July 2026

The primes below a number

1.91.031 July 2026

A run of numbers written as its two ends

1.90.031 July 2026

How long the flight is

1.89.031 July 2026

The antipode

1.88.031 July 2026

The midpoint between two places

1.87.031 July 2026

The earliest sunset

1.86.031 July 2026

The longest day and the shortest

1.85.031 July 2026

The sun question with the question left in

1.84.031 July 2026

Sunrise tomorrow

1.83.031 July 2026

A clock question with a length in it

1.82.031 July 2026

Is anybody at work there

1.81.031 July 2026

When the clocks change

1.80.031 July 2026

Which time zone a place is in

1.79.031 July 2026

The offset of one place

1.78.031 July 2026

Holidays that fall on a weekend

1.77.031 July 2026

Holidays in a month

1.76.031 July 2026

Is today a holiday

1.75.031 July 2026

The next holiday

1.74.031 July 2026

A week on Tuesday

1.73.031 July 2026

The Sunday before Christmas

1.72.031 July 2026

A day counted from a named day

1.71.031 July 2026

How far into a period we are

1.70.031 July 2026

Since points backwards

1.69.031 July 2026

What is left of a period

1.68.031 July 2026

A counted working day is a day the office is open

1.67.031 July 2026

The month next door

1.66.031 July 2026

The month said the way it is said out loud

1.65.031 July 2026

The period we are in

1.64.031 July 2026

An ordinal where only the first was allowed

1.63.131 July 2026

The footer stays where you can see it

1.63.031 July 2026

How long from one sun time to another

1.62.031 July 2026

Ten countries outside Europe know their holidays

1.61.031 July 2026

The holidays a country keeps, listed

1.60.031 July 2026

The difference between two clocks, asked for outright